4" Veneer = 35-40 Sq.Ft./Ton
6" Veneer = 25-30 Sq.Ft./Ton
8" Veneer = 20 Sq.Ft./Ton
3"-6" Veneer = 30Sq.Ft./Ton
3"-5" Veneer = 35 Sq.Ft./Ton
4"-8" Veneer = 25 Sq.Ft./Ton
Note: All converges are approximate. Based on mason's ability, how they are laid, and the style of mortar being used.